Best price professional HTC hair straightener curler electric hair roller meches hair curling machine wand curling iron

FOB Reference Price:Get Latest Price
US $9.9-14.3 / Piece | 10 Piece/Pieces hair curler (Min. Order)
Supply Ability:
10000 Piece/Pieces per Month hair curler
Port:
guangzhou
Report Suspicious Activity
Overview
Quick Details
Material:
Tourmaline
Heater Type:
PTC
Temperature Display:
LED
Place of Origin:
Guangdong, China (Mainland)
Power:
85W
Brand Name:
OEM
Model Number:
NINA-2901
Product name:
hair curler
global voltage:
100-240V
temperature:
121-210℃
Heating time:
30seconds
Color:
Purple
Frequency:
50Hz-60Hz
Certification:
CE, ROHS approval
cord:
9 feet with 360 degree swivel cord
Plug:
US, UK, AU,EU or cusotm
Name:
hair curlers rollers
Packaging & Delivery
Packaging Details
Gift box, color box, carton,can be customized
Delivery Time
15 days depands on the quantity

Best price professional HTC hair straightener curler electric hair roller meches hair curling machine curling iron

curling iron

Product Description

>>>Click to get the latest price & catalogue

Hair Curler Feature:

 

1. 100% tourmaline ceramic heating Barrels, stable heating
2.size: 13-25mm
3.ptc heater, heat up fast;
4.big screen LCD digital display, temp. 121-210°C(250-410°F), interchage between °C and °F
5.gold electroplating handle
6. 1h auto shut off function
7.with protection hat
8.plastic holder
9.Worldwide 100-240V dual voltage
10.Professional 2.5M tangle-free 360°swivel cord

 

 

Related Products

Company Information
FAQ

Q1: Could I put my own logo on it?

Yes,we can accept custom logo,it can be printed or put on the items

 

Q2: Do you accept trial order of small quantity?

Yes, we can accept when we have stock of materials. 

 

Q3:What is the payment term?

Normally we accept T/T (30% deposit before production and the balanced before shipment), the other payment term as customers request

 

Q4 :How long can I expect to get the sample?

It will be ready for delivery in 10-15 days. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you do not have an account.

 

Q5:How about the lead time for mass production?

Generally, the lead time is 15-35 days after getting the confirmation of the order and deposit.

 

Q6:which approval have you passed ?

we have got a series of international certificates,such as GS,CE,ROHS,UL(CUL), and ETL(cETL),PSE from ITS(INTERTEK).so just tell us what kind of certification do you need.we can meet your request.

 

Q7:Why choose us?

1)Professional and experienced R&D team

2)Reliable and strict quality control system. we test all our products before shipment to make sure everything in perfect condition

3)Experienced sales team service for you

contact us