Best price professional HTC hair straightener curler electric hair roller meches hair curling machine wand curling iron

FOB Reference Price:Get Latest Price
US $9.9-14.3 / Pieces | 10 Piece/Pieces hair curler (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Material:
Tourmaline
Heater Type:
PTC
Temperature Display:
LED
Place of Origin:
Guangdong, China (Mainland)
Power:
85W
Brand Name:
OEM
Model Number:
NINA-2901
Product name:
hair curler
global voltage:
100-240V
temperature:
121-210℃
Heating time:
30seconds
Color:
Purple
Frequency:
50Hz-60Hz
Certification:
CE, ROHS approval
cord:
9 feet with 360 degree swivel cord
Plug:
US, UK, AU,EU or cusotm
Name:
hair curlers rollers
SupplyAbility
SupplyAbility:
Piece/Pieces per Month hair curler
Packaging & Delivery
Packaging Details
Gift box, color box, carton,can be customized
Port
guangzhou
Lead Time :
15 days depands on the quantity

Best price professional HTC hair straightener curler electric hair roller meches hair curling machine curling iron

curling iron

Product Description

>>>Click to get the latest price & catalogue

Hair Curler Feature:

 

1. 100% tourmaline ceramic heating Barrels, stable heating
2.size: 13-25mm
3.ptc heater, heat up fast;
4.big screen LCD digital display, temp. 121-210°C(250-410°F), interchage between °C and °F
5.gold electroplating handle
6. 1h auto shut off function
7.with protection hat
8.plastic holder
9.Worldwide 100-240V dual voltage
10.Professional 2.5M tangle-free 360°swivel cord

 

 

Related Products

Company Information
FAQ

Q1: Could I put my own logo on it?

Yes,we can accept custom logo,it can be printed or put on the items

 

Q2: Do you accept trial order of small quantity?

Yes, we can accept when we have stock of materials. 

 

Q3:What is the payment term?

Normally we accept T/T (30% deposit before production and the balanced before shipment), the other payment term as customers request

 

Q4 :How long can I expect to get the sample?

It will be ready for delivery in 10-15 days. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you do not have an account.

 

Q5:How about the lead time for mass production?

Generally, the lead time is 15-35 days after getting the confirmation of the order and deposit.

 

Q6:which approval have you passed ?

we have got a series of international certificates,such as GS,CE,ROHS,UL(CUL), and ETL(cETL),PSE from ITS(INTERTEK).so just tell us what kind of certification do you need.we can meet your request.

 

Q7:Why choose us?

1)Professional and experienced R&D team

2)Reliable and strict quality control system. we test all our products before shipment to make sure everything in perfect condition

3)Experienced sales team service for you

contact us